A working Plan-Do-Check-Act form that gives one operational team a disciplined way to test a process change, check evidence and decide what happens next.

How to use this tool

Work through each stage in order. Your entries save automatically in this browser — you can leave and come back. When a stage is complete, use the yellow gate to check you're ready to move on.

Use Print / save as PDF for a copy of your completed form, or Download blank template for a clean version to print and fill in by hand.

Trial control

Trial details — fill this in before starting

01

Plan — define what you're testing

1.1

What problem are you solving?

Good example: "Maintenance work orders for the crusher circuit are taking an average of 12 days from request to completion, against a target of 5 days."

1.2

Where are you now? (Baseline data)

1.3

Where do you want to be? (Target)

1.4

What's causing the problem? (Root cause)

Use 5 Whys or a fishbone (cause and effect) diagram to find the root cause, not just the symptom.
1.5

What will you try? (Proposed change)

1.6

How will you test it? (Trial design)

Small enough to learn quickly. Big enough to see if it works.
1.7

How will you measure it?

1.8

Stakeholder check

Plan gate — check before you start

Don't start the trial until every box is ticked.

02

Do — run the trial

2.1

Trial log

Record what actually happened during the trial. Be honest — a trial that goes off plan is still useful information.
DateWhat was doneWhoObservations / notes
2.2

Deviations from plan

If the trial didn't go as planned, record it here. This is not a failure — it is information.
DateWhat changedWhyImpact on trial
2.3

Data collection check

Do gate — check before you review

Don't move to Check until every box is ticked.

03

Check — compare trial results to baseline

3.1

Results summary

3.2

Did it meet the success criteria?

3.3

What did you learn?

Check gate — check before you decide

Don't move to Act until every box is ticked.

04

Act — decide and lock in

4.1

Decision

Select the decision that best reflects what the evidence showed.
4.2

Standardise (if adopting or adapting)

Lock the change into the standard way of working. A change that isn't standardised doesn't stick.
4.3

Roll out (if adopting)

4.4

Next cycle (if adapting or starting a new improvement)

What is the next trial? Use this tool again for the next cycle.

Act gate — check before you close

Don't close the cycle until every box is ticked.

Cycle summary

Decision summary — complete at the end of the cycle

Evidence

Evidence register — reference any supporting documents

RefDocument / data sourceLocationDate

Johnstone Business Intelligence quality gate

Johnstone Business Intelligence quality check — a good PDCA cycle has all of these

If you can't tick all eight, that's your next improvement action.